Time Savings

Time Savings

  • Save 7 to 28 days
  • No cure time
  • Same-day installation
  • Year-round installation

Structural Foundations are entirely prefabricated and can be installed and built upon the same day, regardless of the ambient and ground temperatures (including frost).  Installation time ranges from mere minutes to one day per foundation, depending upon foundation size.

 

As set forth by the American Concrete Institute (ACI) Committee 301, minimum time for concrete curing corresponds to 70% of its specified compressive strength. In common practice, this usually is seven days’ cure time for small-volume concrete installations and 14 to 28 days’ cure time for large-volume installations. That’s seven or more days until concrete achieves sufficient strength to be built upon.

 

Structural Foundations accelerates the construction schedule, saving project costs, and yielding earlier use / revenue for project owners.

 6-ton bearing foundation installed in under one hour and ready for immediate construction.  Wind turbine installation in Jackson, Michigan.

Earlier project completion = Earlier use / revenue.