Technology

Seven issued patents, multiple issued foreign patents, and additional patents pending.

Installation Process

Ground Level

Step 1: Hole excavated.

Step 2: Anchor inserted, feet extended, and soils pre-stressed.

Step 3: Steel foundation hydraulically installed using anchor rod.

Step 4: Anchor removed.  Hydraulics removed. Voids filled with excavated material / sand.  Steel foundation secure and ready to be built upon.